MAJOR Projects

TANJUNG KIDURONG COMBINED-CYCLE GAS TURBINE (CCGT) PROJECT

Tanjung Kidurong Combined-Cycle Gas Turbine (CCGT) will be an extension of existing Kidurong Power Station at Bintulu, with 2 Combined-Cycle blocks currently under construction, adding total 800MW (2x400MW) generating capacity at Kidurong Power Station.  The 1-on-1 GT and ST are arranged in multi-shaft configuration enabling Open-Cycle operation (i.e. only gas turbine is running). An integrated cooling water pump house will be circulating sea water as cooling medium to both CCGT blocks. 

The gas turbine deploys twin combustor (EV and SEV) innovative design resulting in improved performance, low exhaust emission while maintaining high operating flexibility. The two CCGT blocks will be one of the highest net efficiency power plant among Sarawak Energy’s generation fleet. 

A STRONGER TRANSMISSION BACKBONE:

500KV SECOND BACKBONE TRANSMISSION LINE:

Sarawak’s Solution For A More Reliable And Modern Power Supply System

In 2013, Sarawak Energy embarked on the 500kV Second Backbone Transmission Grid—a massive state infrastructure upgrading project costing RM2.7 billion.  The critical package was completed in 2017, further enhancing the reliability of Sarawak’s electricity supply. The latter is done through providing additional circuits or lines parallel to the existing 275kV transmission line, connecting major power stations to load centres in southern of Sarawak.  The second backbone also provide adequate transmission security and capacity for future load growth, particularly at Samajaya and power export to West Kalimantan.

NORTHERN GRID DEVELOPMENT

IMPROVE RELIABILITY OF SUPPLY TO MIRI, LIMBANG, LAWAS AND THE SURROUNDING AREAS.

Sarawak Energy has committed to develop the Northern Grid, expand the State Grid to the whole length of Sarawak, reaching the last major populated centre. With a second EHV injection into Miri, the supply reliability and security is improved. Limbang and Lawas regional network will be connected to the State Grid and allow the closure of the existing Limbang and Lawas diesel plants. This development will also provide capacity to meet Limbang and Lawas load growth in the long term and allow the connection of numerous villages under Rural Electrification Scheme (RES).  Furthermore, this project will provide injection point for future power export to Sabah.

See all current power plant projects