BAKUN HYDROELECTRIC PLANT
Performance Highlights
Operational Excellence is one of Sarawak Energy’s key focus areas and hydro power plant performance and reliability are important parameters to be monitored to ensure its operation is at highest efficiency.
Bakun HEP Performance
The Bakun HEP’s performance in terms of Equivalent Availability Factor (EAF) maintained at above 90% since 2018 and achieved its target with a Forced Outage Rate (FOR) below 1%. Despite all the challenges, Bakun HEP's total generation has increased by 1.1% from the year 2021.
Year |
Equivalent Availability Factor (EAF, %) |
Forced Outage Rate (FOR, %) |
2018 |
92.23 |
0.23 |
2019 |
97.13 |
0.70 |
2020 |
94.84 |
0.40 |
2021 |
95.68 |
0.40 |
2022 |
93.88 |
0.67 |
Net Energy Generated
Disclosure |
Unit |
2018 |
2019 |
2020 |
2021 |
2022 |
Bakun |
MWh |
14,351,890.004 |
15,424,402.003 |
14,680,879.002 |
16,239,095.001 |
16,549,475.00* |
The data has been assured by a third party for Sarawak Energy Sustainability Report 2022
Enhancing the operational performance of Bakun HEP
1. Rerating of Bakun Units
Bakun HEP has successfully performed reliability testing to run the machine at 10% or 30MW higher than the installed capacity, generating up to 330MW for Unit 1 to Unit 4 each. This increases the total generation by Bakun HEP up to 2,520MW.
2. Generator Testing and Model Validation
Bakun generators can run at a stable condition with the successful improvement of generator performance after generator testing and model validation in October 2022, which involves the tuning of the Governor and Excitation system. This will improve the power quality and grid stability upon any disturbances happening in the grid.
3. Major Improvement Works
Automatic Tube Cleaning System (ATCS) and Partial Discharge Retrofitting are among the major ongoing improvement projects that have improved the effectiveness of the machines in monitoring and performance. ATCS is an automatic system to clean the Heat Exchanger with an interval of 4 hours to change over to prevent fouling or scaling in the tubing. At present, 6 out of 10 ATCS have been installed with a proven result where reducing the labour-intensive cleaning work of the Heat Exchanger, resulting in a cost saving of approximately RM 600,000.
Enabled measurement of Partial Discharge (PD), which is an indication of insulation issues in electrical equipment and to minimise such risks, PD measurement is a reliable and non-intrusive method that can be used to assess the condition of an electrical asset. PD online monitoring and detection to record real-time data for analysis to detect and prevent severe failure of the stator winding insulation, ensuring long-term, reliable operations of electrical equipment.
Safety Performance
At Sarawak Energy, Health, Safety, Security and Environment (HSSE) is a shared responsibility and we strive to make Sarawak Energy a safe, secure and great place to work. We are focused on establishing a best-in-class HSSE culture to enable business delivery, continuous growth, and value protection as well as maintain our social license to operate.
Safety is our top priority and it is compulsory for all our employees and contractors to comply with the Sarawak Energy Life-Saving Rules, policies and procedures. Together, we want to ensure that everybody goes home safely.
To uphold safety, we are focused on achieving these four elements:
- Leadership – High level commitment and leadership through exemplary conduct
- System and structure – A comprehensive system and tools to ensure full implementation at all levels of the organisation
- Competency – All critical activities are carried out by competent personnel
- Culture and behaviours – Where people take up the necessary initiative and genuinely ‘want to be safe’
We are also inculcating a generative HSSE culture within Sarawak Energy through the HSE Culture focusing on three core behaviours – Assess, Comply and Empower (ACE).
Through the years, we have seen a marked improvement in our pursuit of HSSE excellence.